- Article 1 - Subject matter and scope
- Article 2 - Definitions
- Article 3 - Safety Measures
- Article 4 - Administrative Authority
- Article 5 - Tunnel Manager
- Article 6 - Safety Officer
- Article 7 - Inspection Entity
- Article 8 - Notification of the Administrative Authority
- Article 9 - Tunnels whose design has not yet been approved
- Article 10 - Tunnels whose design has been approved but which are not yet open
- Article 11 - Tunnels already in operation
- Article 12 - Periodic inspections
- Article 13 - Risk analysis
- Article 14 - Derogation for innovative techniques
- Article 15 - Reporting
- Article 16 - Adaptation to technical progress
- Article 17 - Committee procedure
- Article 18 - Transposition
- Article 19 - Entry into force
- Article 20
Article 1 - Subject matter and scope
2. It shall apply to all tunnels in the Trans-European Road Network with lengths of over 500 m, whether they are in operation, under construction or at the design stage.
Article 2 - Definitions
1) | "Trans-European Road Network" means the road network identified in Section 2 of Annex I to Decision No 1692/96/EC and illustrated by maps and/or described in Annex II to that Decision. |
2) | "Emergency services" means all local services, whether public or private or part of the tunnel staff, which intervene in the event of an accident, including police services, fire brigades and rescue teams. |
3) | "Tunnel length" means the length of the longest traffic lane, measured on the fully enclosed part of the tunnel. |
Article 3 - Safety Measures
2. Where certain structural requirements laid down in Annex I can only be satisfied through technical solutions which either cannot be achieved or can be achieved only at disproportionate cost, the Administrative Authority as referred to in Article 4 may accept the implementation of risk reduction measures as an alternative to application of those requirements, provided that the alternative measures will result in equivalent or improved protection. The efficiency of these measures shall be demonstrated through a risk analysis in conformity with the provisions of Article 13. Member States shall inform the Commission of the risk reduction measures accepted as an alternative and provide justification therefor. This paragraph shall not apply to runnels at the design stage as referred to in Article 9.
3. Member States may specify stricter requirements, provided that they do not contravene the requirements of this Directive.
Article 4 - Administrative Authority
2. The Administrative Authority may be set up at national, regional or local level.
3. Each tunnel in the Trans-European Road Network located on the territory of a single Member State shall fall under the responsibility of a single Administrative Authority. For each tunnel located on the territory of two Member States, each Member State shall designate an Administrative Authority or, alternatively, the two Member States shall designate a joint Administrative Authority. If there are two different Administrative Authorities, the decisions of either taken in the exercise of its respective competencies and responsibilities with regard to tunnel safety shall be adopted with the prior agreement of the other Authority.
4. The Administrative Authority shall commission tunnels in accordance with the procedure laid down in Annex II.
5. Without prejudice to further arrangements on this subject at national level, the Administrative Authority shall have power to suspend or restrict the operation of a tunnel if safety requirements are not met. It shall specify the conditions under which normal traffic may be resumed.
6. The Administrative Authority shall ensure that the following tasks are performed:
(a) | testing and inspecting tunnels on a regular basis and drawing up safety requirements pertaining thereto; |
(b) | putting in place organisational and operational schemes (including emergency response plans) for the training and equipping of emergency services; |
(c) | defining the procedure for immediate closure of a tunnel in an emergency; |
(d) | implementing the necessary risk reduction measures. |
7. Where bodies designated as Administrative Authorities existed prior to the designation referred to in this Article, those Administrative Authorities may continue their previous activities provided that they comply with this Directive.
Article 5 - Tunnel Manager
2. For each tunnel located on the territory of two Member States, the two Administrative Authorities or the joint Administrative Authority shall recognise only one body in charge of the operation of the tunnel.
3. Any significant incident or accident occurring in a tunnel shall be the subject of an incident report prepared by the Tunnel Manager. This report shall be forwarded to the Safety Officer referred to in Article 6, to the Administrative Authority and to the emergency services within a maximum period of one month.
4. Where an investigation report is drawn up analysing the circumstances of the incident or accident referred to in paragraph 3 or the conclusions that can be drawn from it, the Tunnel Manager shall forward this report to the Safety Officer, the Administrative Authority and the emergency services no later than one month after he receives it himself.
Article 6 - Safety Officer
2. The Safety Officer shall perform the following tasks/functions:
(a) | ensure coordination with emergency services and take part in the preparation of operational schemes; |
(b) | take part in the planning, implementation and evaluation of emergency operations; |
(c) | take part in the definition of safety schemes and the specification of the structure, equipment and operation in respect of both new tunnels and modifications to existing tunnels; |
(d) | verify that operational staff and emergency services are trained, and he shall take part in the organisation of exercises held at regular intervals; |
(e) | give advice on the commissioning of the structure, equipment and operation of tunnels; |
(f) | verify that the tunnel structure and equipment are maintained and repaired; |
(g) | take part in the evaluation of any significant incident or accident as referred to in Article 5(3) and (4). |
Article 7 - Inspection Entity
Article 8 - Notification of the Administrative Authority
Article 9 - Tunnels whose design has not yet been approved
2. The tunnel shall be commissioned in accordance with the procedure laid down in Annex II.
Article 10 - Tunnels whose design has been approved but which are not yet open
2. Where the Administrative Authority finds that a tunnel does not comply with the provisions of this Directive, it shall notify the Tunnel Manager that appropriate measures must be taken to increase safety and shall inform the Safety Officer.
3. The tunnel shall then be commissioned in accordance with the procedure laid down in Annex II.
Article 11 - Tunnels already in operation
2. The Tunnel Manager shall, if necessary, propose to the Administrative Authority a plan for adapting the tunnel to the provisions of this Directive and the remedial measures he intends to put in place.
3. The Administrative Authority shall give its approval to the remedial measures or ask for them to be modified.
4. Thereafter, if the remedial measures include any substantial modification in the construction or operation, then once these measures have been taken, the procedure laid down in Annex II shall be implemented.
5. Member States shall by (10) submit a report to the Commission on how they plan to meet the requirements of this Directive, on planned measures, and, where appropriate, on the consequences of opening or closing the main access roads to the tunnels. In order to minimise disturbances to traffic at European level, the Commission may comment on the timetable of the work intended to ensure that tunnels comply with the requirements of this Directive.
6. The refurbishment of tunnels shall be carried out according to a schedule and shall be finished by [...] (11).
7. Where the total tube length of existing tunnels divided by the total length of the part of the Trans-European Road Network located on their territory exceeds the European average, Members States may extend the period stipulated in paragraph 6 by five years.
Article 12 - Periodic inspections
2. The period between two consecutive inspections of any given tunnel shall not exceed six years.
3. Where, on the basis of the report of the Inspection Entity, the Administrative Authority finds that a tunnel does not comply with the provisions of this Directive, it shall notify the Tunnel Manager and the Safety Officer that measures to increase tunnel safety must be adopted. The Administrative Authority shall define the conditions for continuing to operate the tunnel or for re-opening the tunnel which will apply until the remedial measures and any further relevant restrictions or conditions are implemented.
4. If the remedial measures include any substantial modification in the tunnel's construction or operation, then once these measures have been taken, the tunnel shall be made the subject of a new authorisation to operate in accordance with the procedure laid down in Annex II.
Article 13 - Risk analysis
2. Member States shall ensure that, at national level, a detailed and well-defined methodology, corresponding to the best available practices, is used and shall inform the Commission of the methodology applied; the Commission shall make this information available in electronic form to other Member States.
3. By [...] (12) the Commission shall publish a report on the practice followed in the Members States. Where necessary, it shall make proposals for the adoption of a common harmonised risk analysis methodology in accordance with the procedure referred to in Article 17(2).
Article 14 - Derogation for innovative techniques
2. If the Administrative Authority intends to grant such a derogation, the Member State shall first submit a derogation application to the Commission containing the initial request and the opinion of the Inspection Entity.
3. The Commission shall notify the application to the Member States within one month of receipt.
4. If, within a period of three months, neither the Commission nor a Member State formulates objections, the derogation shall be treated as granted and the Commission shall inform all Member States accordingly.
5. If objections are expressed, the Commission shall make a proposal in accordance with the procedure referred to in Article 17(2). Where the decision is negative, the Administrative Authority shall not grant the derogation.
6. After an examination in accordance with the procedure referred to in Article 17(2), a decision to grant a derogation may allow this derogation to be applied to other tunnels.
7. Whenever justified by the derogation requests submitted to it, the Commission shall publish a report on the practice followed in the Member States and, if necessary, make proposals for amendment of this Directive.
Article 15 - Reporting
2. Member States shall make a plan which includes a timetable for the gradual application of the provisions of this Directive to tunnels already in operation as described in Article 11 and notify it by [...] (13) to the Commission. Thereafter, Member States shall inform the Commission every two years of the state of implementation of the plan and of any changes made to it, until the end of the period referred to in Article 11(6) and (7).
Article 16 - Adaptation to technical progress
Article 17 - Committee procedure
2. Where reference is made to this paragraph, Articles 5 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.
3. The Committee shall adopt its rules of procedure.
Article 18 - Transposition