Legal provisions of COM(1973)276 -

Please note

This page contains a limited version of this dossier in the EU Monitor.

dossier COM(1973)276 - .
document COM(1973)276 EN
date November  4, 1976


Article 1

This Directive shall apply to new direct connected induction meters, with single or multiple tariffs, designed to measure active energy single-phase or polyphase current at 50 Hz frequency.

Article 2

The electrical energy meters which may be given EEC marks and signs are described in the Annex to this Directive.

They shall be the subject of EEC type approval and shall be submitted for EEC initial verification.

Article 3

Member States may not prevent, prohibit or restrict the placing on the market or entry into service of electrical energy meters if such meters bear the EEC type-approval sign and the EEC initial verification mark.

Member States which use maximum permissible errors smaller than those set out in the Directive for initial verification may continue to use such maximum permissible errors during a period of five and a half years from the notification of this Directive.

In the light of experience gained in this period of derogation and of the results obtained in international bodies, the appropriate measures shall be taken before the end of this five and a half year period, according to the procedure set out in Article 19 of Directive 71/316/EEC.

Article 4

1. Member States shall put into force the laws, regulations and administrative provisions needed in order to comply with this Directive within eighteen months of its notification and shall forthwith inform the Commission thereof.

2. Member States shall ensure that the text of the provisions of national law which they adopt in the field covered by this Directive is communicated to the Commission.

Article 5

This Directive is addressed to the Member States.