The internal market in electricity, which has been progressively implemented since 1999, aims to deliver real choice for all consumers in the Community, be they citizens or businesses, new business opportunities and more cross-border trade, so as to achieve efficiency gains, competitive prices and higher standards of service, and to contribute to security of supply and sustainability.
(2)
Directive 2003/54/EC of the European Parliament and of the Council of 26 June 2003 concerning common rules for the internal market in electricity (4) and Regulation (EC) No 1228/2003 of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity (5) have made significant contributions towards the creation of such an internal market in electricity.
(3)
However, at present, there are obstacles to the sale of electricity on equal terms, without discrimination or disadvantage in the Community. In particular, non-discriminatory network access and an equally effective level of regulatory supervision do not yet exist in each Member State, and isolated markets persist.
(4)
The Communication of the Commission of 10 January 2007 entitled ‘An Energy Policy for Europe’ highlighted the importance of completing the internal market in electricity and creating a level playing field for all electricity undertakings in the Community. The Communications of the Commission of 10 January 2007 entitled ‘Prospects for the internal gas and electricity market’ and ‘Inquiry pursuant to Article 17 of Regulation (EC) No 1/2003 into the European gas and electricity sectors (Final Report)’ demonstrated that the present rules and measures neither provide the necessary framework nor provide for the creation of interconnection capacities to achieve the objective of a well-functioning, efficient and open internal market.
(5)
In addition to thoroughly implementing the existing regulatory framework, the regulatory framework for the internal market in electricity set out in Regulation (EC) No 1228/2003 should be adapted in line with those communications.
(6)
In particular, increased cooperation and coordination among transmission system operators is required to create network codes for providing and managing effective and transparent access to the transmission networks across borders, and to ensure coordinated and sufficiently forward-looking planning and sound technical evolution of the transmission system in the Community, including the creation of interconnection capacities, with due regard to the environment. Those network codes should be in line with framework guidelines, which are non-binding in nature (framework guidelines) and which are developed by the Agency for the Cooperation of Energy Regulators established by Regulation (EC) No 713/2009 of the European Parliament and of the Council of 13 July 2009 establishing an Agency for the Cooperation of Energy Regulators (6) (the Agency). The Agency should have a role in reviewing, based on matters of fact, draft network codes, including their compliance with the framework guidelines, and it should be enabled to recommend them for adoption by the Commission. The Agency should assess proposed amendments to the network codes and it should be enabled to recommend them for adoption by the Commission. Transmission system operators should operate their networks in accordance with those network codes.
(7)
In order to ensure optimal management of the electricity transmission network and to allow trading and supplying electricity across borders in the Community, a European Network of Transmission System Operators for Electricity (the ENTSO for Electricity), should be established. The tasks of the ENTSO for Electricity should be carried out in compliance with Community competition rules which remain applicable to the decisions of the ENTSO for Electricity. The tasks of the ENTSO for Electricity should be well-defined and its working method should ensure efficiency, transparency and the representative nature of the ENTSO for Electricity. The network codes prepared by the ENTSO for Electricity are not intended to replace the necessary national network codes for non-cross-border issues. Given that more effective progress may be achieved through an approach at regional level, transmission system operators should set up regional structures within the overall cooperation structure, whilst ensuring that results at regional level are compatible with network codes and non-binding ten-year network development plans at Community level. Member States should promote cooperation and monitor the effectiveness of the network at regional level. Cooperation at regional level should be compatible with progress towards a competitive and efficient internal market in electricity.
(8)
All market participants have an interest in the work expected of the ENTSO for Electricity. An effective consultation process is therefore essential and existing structures that are set up to facilitate and streamline the consultation process, such as the Union for the Coordination of Transmission of Electricity, national regulators or the Agency, should play an important role.
(9)
In order to ensure greater transparency regarding the entire electricity transmission network in the Community, the ENTSO for Electricity should draw up, publish and regularly update a non-binding Community-wide ten-year network development plan (Community-wide network development plan). Viable electricity transmission networks and necessary regional interconnections, relevant from a commercial or security of supply point of view, should be included in that network development plan.
(10)
This Regulation should lay down basic principles with regard to tarification and capacity allocation, whilst providing for the adoption of Guidelines detailing further relevant principles and methodologies, in order to allow rapid adaptation to changed circumstances.
(11)
In an open, competitive market, transmission system operators should be compensated for costs incurred as a result of hosting cross-border flows of electricity on their networks by the operators of the transmission systems from which cross-border flows originate and the systems where those flows end.
(12)
Payments and receipts resulting from compensation between transmission system operators should be taken into account when setting national network tariffs.
(13)
The actual amount payable for cross-border access to the system can vary considerably, depending on the transmission system operator involved and as a result of differences in the structure of the tarification systems applied in Member States. A certain degree of harmonisation is therefore necessary in order to avoid distortions of trade.
(14)
A proper system of long-term locational signals is necessary, based on the principle that the level of the network access charges should reflect the balance between generation and consumption of the region concerned, on the basis of a differentiation of the network access charges on producers and/or consumers.
(15)
It would not be appropriate to apply distance-related tariffs or, provided appropriate locational signals are in place, a specific tariff to be paid only by exporters or importers in addition to the general charge for access to the national network.
(16)
The precondition for effective competition in the internal market in electricity is non-discriminatory and transparent charges for network use including interconnecting lines in the transmission system. The available capacity of those lines should be set at the maximum levels consistent with the safety standards of secure network operation.
(17)
It is important to avoid distortion of competition resulting from the differing safety, operational and planning standards used by transmission system operators in Member States. Moreover, there should be transparency for market participants concerning available transfer capacities and the security, planning and operational standards that affect the available transfer capacities.
(18)
Market monitoring undertaken over recent years by the national regulatory authorities and by the Commission has shown that current transparency requirements and rules on access to infrastructure are not sufficient to secure a genuine, well-functioning, open and efficient internal market in electricity.
(19)
Equal access to information on the physical status and efficiency of the system is necessary to enable all market participants to assess the overall demand and supply situation and identify the reasons for movements in the wholesale price. This includes more precise information on electricity generation, supply and demand including forecasts, network and interconnection capacity, flows and maintenance, balancing and reserve capacity.
(20)
To enhance trust in the market, its participants need to be sure that those engaging in abusive behaviour can be subject to effective, proportionate and dissuasive penalties. The competent authorities should be given the competence to investigate effectively allegations of market abuse. To that end, it is necessary that competent authorities have access to data that provides information on operational decisions made by supply undertakings. In the electricity market, many relevant decisions are made by the generators, which should keep information in relation thereto available to and easily accessible by the competent authorities for a fixed period of time. The competent authorities should, furthermore, regularly monitor the compliance of the transmission system operators with the rules. Small generators with no real ability to distort the market should be exempt from that obligation.
(21)
There should be rules on the use of revenues flowing from congestion-management procedures, unless the specific nature of the interconnector concerned justifies an exemption from those rules.
(22)
The management of congestion problems should provide correct economic signals to transmission system operators and market participants and should be based on market mechanisms.
(23)
Investments in major new infrastructure should be promoted strongly while ensuring the proper functioning of the internal market in electricity. In order to enhance the positive effect of exempted direct current interconnectors on competition and security of supply, market interest during the project-planning phase should be tested and congestion-management rules should be adopted. Where direct current interconnectors are located in the territory of more than one Member State, the Agency should handle as a last resort the exemption request in order to take better account of its cross-border implications and to facilitate its administrative handling. Moreover, given the exceptional risk profile of constructing those exempt major infrastructure projects, undertakings with supply and production interests should be able to benefit from a temporary derogation from the full unbundling rules for the projects concerned. Exemptions granted under Regulation (EC) No 1228/2003 continue to apply until the scheduled expiry date as decided in the granted exemption decision.
(24)
To ensure the smooth functioning of the internal market in electricity, provision should be made for procedures which allow the adoption of decisions and Guidelines with regard, inter alia, to tarification and capacity allocation by the Commission whilst ensuring the involvement of Member States’ regulatory authorities in that process, where appropriate through their European association. Regulatory authorities, together with other relevant authorities in the Member States, have an important role to play in contributing to the proper functioning of the internal market in electricity.
(25)
National regulatory authorities should ensure compliance with the rules contained in this Regulation and the Guidelines adopted pursuant thereto.
(26)
The Member States and the competent national authorities should be required to provide relevant information to the Commission. Such information should be treated confidentially by the Commission. Where necessary, the Commission should have an opportunity to request relevant information directly from undertakings concerned, provided that the competent national authorities are informed.
(27)
Member States should lay down rules on penalties applicable to infringements of the provisions of this Regulation and ensure that they are implemented. Those penalties must be effective, proportionate and dissuasive.
(28)
The measures necessary for the implementation of this Regulation should be adopted in accordance with Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission (7).
(29)
In particular, the Commission should be empowered to establish or adopt the Guidelines necessary for providing the minimum degree of harmonisation required to achieve the aims of this Regulation. Since those measures are of general scope and are designed to amend non-essential elements of this Regulation, by supplementing it with new non-essential elements, they must be adopted in accordance with the regulatory procedure with scrutiny provided for in Article 5a of Decision 1999/468/EC.
(30)
Since the objective of this Regulation, namely the provision of a harmonised framework for cross-border exchanges of electricity, cannot be sufficiently achieved by the Member States and can therefore be better achieved at Community level, the Community may adopt measures, in accordance with the principle of subsidiarity, as set out in Article 5 of the Treaty. In accordance with the principle of proportionality, as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve that objective.
(31)
Given the scope of the amendments that are being made herein to Regulation (EC) No 1228/2003, it is desirable, for reasons of clarity and rationalisation, that the provisions in question should be recast by bringing them all together in a single text in a new Regulation,