Considerations on COM(2023)94 - Measures to reduce the cost of deploying gigabit electronic communications networks and repealing Directive 2014/61/EU (Gigabit Infrastructure Act)

Please note

This page contains a limited version of this dossier in the EU Monitor.

 
 
(1) The digital economy has been changing the internal market profoundly over the last decade. The Union’s vision is a digital economy that delivers sustainable economic and social benefits based on excellent and secure connectivity for everybody and everywhere in Europe. A high-quality digital infrastructure based on very high capacity networks underpins almost all sectors of a modern and innovative economy. It is of strategic importance to social and territorial cohesion and overall for the Union’s competitiveness and digital leadership. Therefore, people as well as the private and public sectors should have the opportunity to be part of the digital economy.

(2) The rapid evolution of technologies, the exponential growth in broadband traffic and the increasing demand for advanced very high-capacity connectivity have further accelerated during the COVID-19 pandemic. As a result, the targets laid down in the Digital Agenda in 2010 31 have mostly been met, but they have also become obsolete. The share of households having access to 30 Mbps internet speeds has increased from 58.1% in 2013 to 90% in 2022. Availability of only 30 Mbps is no longer future-proof and not aligned with the new objectives set in Directive (EU) 2018/1972 of the European Parliament and of the Council 32 for ensuring connectivity and widespread availability of very high capacity networks. Therefore, in the Decision (EU) 2022/2481 of the European Parliament and Council 33 , the EU set updated targets for 2030 that better correspond to the expected connectivity needs of the future where all European households should be covered by a gigabit network, with all populated areas covered by 5G.

(3) To achieve those targets, there is a need for policies to speed up and lower the costs of the deployment of very high-capacity fixed and wireless networks across the Union, including proper planning, coordination and the reduction of administrative burdens.

(4) Directive 2014/61/EU, which was adopted in response to the need for policies to lower the costs of broadband deployment, included measures on infrastructure sharing, civil works coordination and the reduction of administrative burdens. To further facilitate the roll-out of very high capacity networks, including fibre and 5G, the European Council, called in its Conclusions on Shaping Europe’s Digital Future of 9 June 2020, called for a package of additional measures to support current and emerging network deployment needs, including by reviewing Directive 2014/61/EU.

(5) The roll-out of very high capacity networks (as defined in Directive (EU) 2018/1972) across the Union requires substantial investment, a significant proportion of which is the cost of civil engineering works. Sharing physical infrastructure would limit the need for costly civil engineering works and make advanced broadband roll-out more effective.

(6) A major part of the costs of deploying very high capacity networks can be attributed to inefficiencies in the roll-out process related to: (i) the use of existing passive infrastructure (such as ducts, conduits, manholes, cabinets, poles, masts, antenna installations, towers and other supporting constructions); (ii) bottlenecks related to the coordination of civil works; (iii) burdensome administrative procedures to grant permits; and (iv) bottlenecks in in-building deployment of networks, which lead to high financial barriers, particularly in rural areas.

(7) Directive 2014/61/EU of the European Parliament and of the Council 34 , which was adopted in response to the need to lower the costs of broadband deployment, included measures on infrastructure sharing, civil works coordination and the reduction of administrative burdens. To further facilitate the roll-out of very high capacity networks, including fibre and 5G, the European Council, in its Conclusions on Shaping Europe’s Digital Future of 9 June 2020, called for a package of additional measures to support current and emerging network deployment needs, including by reviewing Directive 2014/61/EU.

(8) The measures set out in Directive 2014/61/EU contributed to less costly deployments of high-speed electronic communications networks. However, these measures should be strengthened to further reduce costs and speed up network deployment.

(9) Measures aiming to make using public and private existing infrastructures more efficient and reduce costs and obstacles in carrying out new civil engineering works should contribute substantially to ensuring a fast and extensive deployment of very high capacity networks. These measures should maintain effective competition without harming the safety, security and smooth operation of the existing infrastructure.

(10) Some Member States have adopted measures to reduce the costs of broadband roll-out, including by going beyond the provisions of Directive 2014/61/EU. However, those measures are still very different across Member States and have led to different results across the Union. Scaling up some of those measures across the Union and taking new reinforced measures could significantly contribute to the better functioning of the digital single market. Moreover, differences in regulatory requirements and inconsistent implementation of Union rules sometimes prevent cooperation across utility companies. The differences may also raise barriers to entry for new undertakings providing or authorised to provide public electronics communications networks or associated facilities, as defined in Directive (EU) 2018/1972 (‘operators’). These differences may also close off new business opportunities, hindering the development of an internal market for the use and deployment of physical infrastructures for very high capacity networks. Moreover, the measures notified in the national roadmaps and implementation reports adopted by Member States under Commission Recommendation (EU) 2020/1307 35  neither cover all the areas of Directive 2014/61/EU nor address all issues in a consistent and complete manner. This is despite how essential it is to take action across the whole roll-out process and across sectors to achieve a coherent and significant impact.

(11) This Regulation aims to strengthen and harmonise rights and obligations applicable across the Union to accelerate the roll-out of very high capacity networks and cross-sector coordination. Due to the persistent fragmentation of electronic communications markets in individual national markets, undertakings providing or authorised to provide electronic communications networks are unable to achieve economies of scale. This can have a strong downstream effect on cross-border trade and services provision, since many services can only be provided where an adequately performant network is in place across the Union. While ensuring an improved level playing field, this Regulation does not prevent national measures in compliance with Union law that serve to promote the joint use of existing physical infrastructure or enable a more efficient deployment of new physical infrastructure by complementing the rights and obligations laid down in this Regulation. For example, Member States could extend provisions on civil works coordination also to privately funded projects or require that more information on physical infrastructure or planned civil works is provided to a single information point in electronic format, provided that they do not violate Union law including the provisions of this Regulation.

(12) To ensure legal certainty, including regarding specific regulatory measures imposed under Directive (EU) 2018/1972, under Title II, Chapters II to IV and Directive 2002/77/EC 36 , the provisions of these directives should prevail over this Regulation.

(13) It can be significantly more efficient for operators, in particular new entrants, to reuse existing physical infrastructure, including that of other utilities, to roll out very high capacity networks or associated facilities. This is the case, in particular, in areas where no suitable electronic communications network is available or where it may not be economically feasible to build new physical infrastructure. Moreover, synergies across sectors may significantly reduce the need for civil works relating to the deployment of very high capacity networks. This reuse can also reduce the social and environmental costs linked to these works, such as pollution, noise and traffic congestion. Therefore, this Regulation should apply not only to operators but also to owners or holders of rights to use extensive and ubiquitous physical infrastructure suitable to host electronic communications network elements, such as physical networks for the provision of electricity, gas, water and sewage and drainage systems, and heating and transport services. In the case of holders of rights, this does not change any property rights of third parties.

(14) To improve the deployment of very high capacity networks in the internal market, this Regulation should lay down rights for undertakings providing public electronic communications networks or associated facilities (including undertakings of a public nature) to access physical infrastructure regardless of its location under fair and reasonable terms consistent with the normal exercise of property rights. The obligation to give access to the physical infrastructure should be without prejudice to the rights of the owner of the land or of the building in which the infrastructure is located.

(15) In particular, taking into account the fast development of providers of wireless physical infrastructure such as ‘tower companies’, and their increasingly significant role as providers of access to physical infrastructure suitable to install elements of wireless electronic communications networks, such as 5G, the definition of ‘network operator’ should be extended beyond undertakings providing or authorised to provide electronic communications networks and operators of other types of networks, such as transport, gas or electricity, to include undertakings providing associated facilities, which thus become subject to all the obligations and benefits set out in the Regulation, except the provisions regarding in-building physical infrastructure and access.

(16) In view of their low degree of differentiation, the physical facilities of a network can often host a wide range of electronic communications network elements at the same time without affecting the main service provided and with minimum adaptation costs. These elements include those capable of delivering broadband access services at speeds of at least 100 Mbps in line with the technological neutrality principle. Therefore, physical infrastructure, that is intended to only host other elements of a network without becoming an active network element itself, such as dark fibre, can in principle be used to accommodate electronic communications cables, equipment or any other element of electronic communications networks, regardless of its current use or its ownership, security concerns or future business interests of the infrastructure’s owner. The physical infrastructure of public electronic communications networks can in principle also be used to accommodate elements of other networks. Therefore, in appropriate cases, public electronic communications network operators may give access to their networks so that other networks can be deployed. Without prejudice to the pursuit of the specific general interest linked to the provision of the main service, synergies between network operators should at the same time be encouraged to contribute to achieving the digital targets set out in Decision (EU) 2022/2481.

(17) In the absence of a justified exception, physical infrastructure elements owned or controlled by public sector bodies, even when they are not part of a network, can also host electronic communications network elements and should be made accessible to facilitate installing network elements of very high capacity networks, in particular wireless networks. Examples of physical infrastructure elements are buildings, entries to buildings, and any other asset, including street furniture, such as light poles, street signs, traffic lights, billboards, bus and tramway stops and metro stations. It is for Member States to identify specific buildings owned or controlled by public sector bodies in their territories where access obligations cannot apply, for example, for reasons of architectural, historical, religious or natural value.

(18) This Regulation should be without prejudice to any specific safeguard needed to ensure safety and public health, the security and integrity of the networks, in particular critical infrastructure, as defined by national law, and to ensure that the main service provided by the network operator is not affected, in particular in networks used for the provision of water intended for human consumption. However, general rules in national legislation prohibiting network operators from negotiating access to physical infrastructures by undertakings providing or authorised to provide electronic communications networks or associated facilities could prevent creating a market for access to physical infrastructure. Such general rules should therefore be abolished. At the same time, the measures set out in this Regulation should not prevent Member States from incentivising utility operators to give access to infrastructure by excluding revenue generated from the access to their physical infrastructure when calculating end-user tariffs for their main activity or activities, in accordance with applicable Union law.

(19) In order to ensure legal certainty and avoid disproportionate burdens on network operators resulting from the simultaneous application of two distinct access regimes to the same physical infrastructure, physical infrastructure subject to access obligations imposed by national regulatory authorities pursuant to Directive (EU) 2018/1972 or access obligations resulting from the application of Union State aid rules should not be subject to access obligations set out in this Regulation for as long as such access obligations remain in place. However, this Regulation should be applicable where a national regulatory authority has imposed an access obligation under Directive (EU) 2018/1972 that limits the use that can be made of the physical infrastructure concerned. For instance, this could occur when an operator planning to connect base stations requests access to existing physical infrastructure to which access obligations are imposed in the market for access to wholesale dedicated capacity 37 .

(20) To ensure proportionality and preserve investment incentives, a network operator or public sector body should have the right to refuse access to specific physical infrastructure for objective and justified reasons. In particular, a physical infrastructure for which access has been requested could be technically unsuitable due to specific circumstances, or because of lack of currently available space or future needs for space that are sufficiently demonstrated, for instance, in publicly available investment plans. To ensure proportionality and preserve investment incentives, a network operator or public sector body may refuse access to specific physical infrastructure. To avoid any potential distortion of competition or any possible abuse of the conditions to refuse access, any such refusal should be duly justified and based on objective and detailed reasons. For example such reasons would not be considered objective where an undertaking providing or authorised to provide electronic communications networks has deployed physical infrastructure thanks to civil works coordination with a network operator other than an electronic communications network operator and refuses to grant access based on an alleged lack of availability of space to host the elements of very high capacity networks which results from decisions made by the undertaking under its control. In such case, a competition distortion could arise if there is no other VHCN in the area concerned by the access request. Similarly, in specific circumstances, sharing the infrastructure could jeopardise safety or public health, network integrity and security, including that of critical infrastructure, or could endanger the provision of services that are primarily provided over the same infrastructure. Moreover, where the network operator already provides a viable alternative means of wholesale physical access to electronic communications networks that would meet the needs of the access seeker, such as dark fibre or fibre unbundling, access to the underlying physical infrastructure could have an adverse economic impact on its business model, in particular that of wholesale-only operators, and incentives to invest. It may also risk an inefficient duplication of network elements. The assessment of the fair and reasonable character of the terms and conditions for such alternative means of wholesale physical access should take into account, inter alia, the underlying business model of the undertaking providing or authorised to provide public electronic communications networks granting access and the need to avoid any reinforcement of the significant market power, if any, of either party.

(21) To facilitate the reuse of existing physical infrastructure, where operators request access in a specified area, network operators and public sector bodies that own or control physical infrastructure should make an offer for the shared use of their facilities under fair and reasonable terms and conditions, including price, unless access is refused for objective and justified reasons. Public sector bodies should also be required to offer access under non-discriminatory terms and conditions. Depending on the circumstances, several factors could influence the conditions under which such access is granted. These include: (i) any additional maintenance and adaptation costs; (ii) any preventive safeguards to be adopted to limit adverse effects on network safety, security and integrity; (iii) any specific liability arrangements in the event of damages; (iv) the use of any public subsidy granted for the construction of the infrastructure, including specific terms and conditions attached to the subsidy or provided under national law in compliance with Union law; (v) the ability to deliver or provide infrastructure capacity to meet public service obligations; and (vi) any constraints stemming from national provisions aiming to protect the environment, public health, public security or to meet town and country planning objectives.

(22) Investments in physical infrastructure of public electronic communications networks or associated facilities should directly contribute to the objectives set out in Decision (EU) 2022/2481 and avoid opportunistic behaviour. Therefore, any obligation of access to existing physical infrastructure or coordination of civil works should fully take into account a number of factors such as (i) the economic viability of those investments based on their risk profile; (ii) any time schedule for the return on investment; (iii) any impact that the access has on downstream competition and consequently on prices and return on investment; (iv) any depreciation of the network assets at the time of the access request; (v) any business case underpinning the investment, in particular in the physical infrastructure used for providing very high capacity network services; and (vi) any possibility previously offered to the access seeker to co-deploy.

(23) Public sector bodies that own or control physical infrastructure may lack sufficient resources, experience or the necessary technical knowledge to engage in negotiations with operators on access. To facilitate access to these public sector bodies’ physical infrastructure, a body could be appointed to coordinate the access requests, provide legal and technical advice for negotiating access terms and conditions, and make relevant information on such physical infrastructure available via a single information point. The coordinating body could also support public sector bodies in preparing model contracts and monitor the outcome and the length of time of the access requests process. The body could also help if disputes arise on access to physical infrastructure that public sector bodies own or control.

(24) To ensure consistency of approaches among Member States, the Commission, in close cooperation with the Body of European Regulators for Electronic Communications (BEREC), could provide guidance on applying the provisions on access to physical infrastructure, including but not only on the application of fair and reasonable conditions. The views of stakeholders and national dispute settlement bodies should be duly taken into account in the preparation of the guidance. 

(25) Operators should have access to minimum information on physical infrastructure and planned civil works in the area of deployment. This will enable them to effectively plan deploying very high capacity networks and ensure the most effective use of existing physical infrastructure, suitable for rolling out such networks, and planned civil works. Such minimum information is a pre-requisite to assess the potential for using existing physical infrastructure or coordinating the planned civil works in a specific area, as well as to reduce damage to any existing physical infrastructures. In view of the number of stakeholders involved (covering publicly and privately financed civil works as well as existing or planned physical infrastructure) and to facilitate access to that information (across sectors and borders), the network operators and public sector bodies subject to transparency obligations should proactively (rather than upon request) provide and maintain such minimum information via a single information point. This will simplify managing requests to access such information and enable operators to express their interest in accessing physical infrastructure or coordinating civil works, for which timing is critical. The minimum information on planned civil works should be provided via a single information point as soon as the information is available to the network operator concerned and, in any event and where permits are required, no later than 3 months before the permit application is first submitted to the competent authorities.

(26) The minimum information should be made available promptly via the single information point under proportionate, non-discriminatory and transparent terms so that operators can submit their requests for information. The single information point should consist of a repository of information in electronic format, where information can be accessed and requests can be made online using digital tools, such as webpages, digital applications, and digital platforms. The information made available may be limited to ensure network security and integrity, in particular that of critical infrastructure, national security, or to safeguard legitimate operating and business secrets. The single information point does not have to host the information as long as it ensures that links are available to other digital tools, such as web portals, digital platforms or digital applications, where the information is stored. The single information point may provide additional functionalities, such as access to additional information or support to the process of requests for access to existing physical infrastructure or to coordinate civil works. 

(27) In addition, if the request is reasonable, in particular if needed to share existing physical infrastructures or coordinate civil works, operators should be granted the possibility to make on-site surveys and request information on planned civil works under transparent, proportionate and non-discriminatory conditions and without prejudice to the safeguards adopted to ensure network security and integrity, protection of confidentiality, as well as operating and business secrets.

(28) Advanced transparency of planned civil works via single information points should be incentivised. This can be done by easily redirecting operators to such information whenever available. Transparency should also be enforced by making permit-granting applications subject to prior publication of information on planned civil works via a single information point.

(29) The discretion that Member States retain to allocate the functions of the single information points to more than one competent body should not affect their ability to effectively fulfil those functions. Where more than one single information point is set up in a Member State, a single national digital entry point consisting of a common user interface should ensure seamless access to all single information points by electronic means. The single information point should be fully digitised and provide easy access to the relevant digital tools. This will enable network operators and public sector bodies exercise their rights and comply with the obligations set out in this Regulation. This includes fast access to the minimum information on existing physical infrastructure and planned civil works, electronic administrative procedures for granting permits and rights of way, and the applicable conditions and procedures. As part of this minimum information, the single information point should give access to georeferenced information on the location of existing physical infrastructure and planned civil works. To facilitate this, Member States should provide automated digital tools for the submission of the georeferenced information and conversion tools to the supported data formats. These could be made available to network operators and public sector bodies responsible for providing this information via the single information point. Furthermore, where georeferenced location data are available via other digital tools, such as the INSPIRE Geoportal under Directive 2007/2/EC of the European Parliament and of the Council 38 , the single information point could provide user-friendly access to this information.

(30) To ensure proportionality and security, the requirement to provide information on existing physical infrastructure via the single information point need not apply for the same reasons as those justifying a refusal of an access request. In addition, providing information on existing physical infrastructure via the single information point could, in very specific cases, be burdensome or disproportionate for network operators and public sector bodies. This could arise, for example, where the mapping of relevant assets is not yet available and it would be very costly to map or where access requests are expected to be very low in certain areas of a Member State or in respect to certain specific physical infrastructure. Where it appears that providing information is disproportionate based on a detailed cost-benefit analysis, network operators and public sector bodies should not be obliged to provide such information. Member States should conduct such detailed cost-benefit analysis based on a consultation with stakeholders on demand for access to existing physical infrastructure, and the analysis should be updated regularly. The consultation process and its outcome should be made public, and the specific physical infrastructure to be exempted from this obligation should be notified to the Commission.

(31) To ensure consistency, the competent bodies performing the functions of the single information point, the national regulatory authorities fulfilling their tasks under Directive (EU) 2018/1972 or other competent authorities, such as national, regional or local authorities in charge of cadastre or the implementation of Directive 2007/2/EC (INSPIRE), as appropriate, should consult and cooperate with each other. The purpose of such cooperation should be to minimise the efforts in complying with transparency obligations on network operators and public sector bodies, including the undertakings designated with significant market power (‘SMP’ operators), to make information available about their physical infrastructure; Where a different data set on physical infrastructure of the SMP operator is required such cooperation should result in establishing useful interlinks and synergies between the SMP-related database and the single information point and proportionate common practices of data collection and data provision to deliver results that are easily comparable. Cooperation should also aim at facilitating access to information on physical infrastructure, in light of national circumstances. If regulatory obligations are modified or withdrawn, the parties affected should be able to agree on the best solutions to adapt the collection and provision of physical infrastructure data to the newly applicable regulatory requirements.

(32) The transparency obligation for the coordination of civil works need not apply to civil works for reasons of national security or in an emergency. This could be the case, for civil works performed if there is a risk of public danger as a result of degradation processes to civil engineering works and their associated installations, which are caused by destructive natural or human factors and are needed to ensure their safety or their demolition. For reasons of transparency, Member States should notify the types of civil works falling under those circumstances to the Commission and publish them via a single information point.

(33) To ensure significant savings and minimise inconveniences to the area affected by the deployment of new electronic communications networks, regulatory constraints preventing as a general rule the negotiation among network operators of agreements to coordinate civil works to deploy very high capacity networks should be prohibited. If civil works are not financed by public means, this Regulation should be without prejudice to the possibility for network operators to conclude civil works coordination agreements according to their own investment and business plans and their preferred timing.

(34) Member States should maximise the results of civil works fully or partially financed by public means, by exploiting the positive externalities of those works across sectors and ensuring equal opportunities to share the available and planned physical infrastructure to deploy very high capacity networks. The main purpose of civil works financed by public means should not be adversely affected. However, timely and reasonable requests to coordinate the deployment of elements of very high capacity networks should be met by the network operator carrying out the civil works concerned directly or indirectly (for example, through a sub-contractor) under proportionate, non-discriminatory and transparent terms. For example, the requesting operator should cover any additional costs, including those caused by delays and keep changes to the original plans to a minimum Such provisions should not affect the right of Member States to reserve capacity for electronic communications networks even in the absence of specific requests. This will enable Member States to meet future demand for physical infrastructures to maximise the value of civil works or to adopt measures giving similar rights to operators of other types of networks, such as transport, gas or electricity, to coordinate civil works.

(35) In some cases, in particular for deployments in rural, remote or scarcely populated areas, the obligation to coordinate civil works might put at risk the financial viability of such deployments and eventually disincentivize investments carried out under market terms. Therefore, a request to an undertaking providing or authorised to provide public electronic communications networks to coordinate civil works might be considered unreasonable under specific circumstances. This should be the case, in particular, if the requesting undertaking providing or authorised to provide electronic communications networks did not state its intention to deploy very high capacity networks in that area (either as a new deployment, an upgrade or an extension of a network) and there had been a forecast or invitation to declare an intention to deploy very high capacity networks in designated areas (pursuant to Article 22 of Directive (EU) 2018/1972) or a public consultation under Union State aid rules. If more than one of those forecasts, invitations and/or public consultations have occurred, only the lack of an expression of interest at the most recent occasion covering the period during which the request for coordination of civil works is made should be considered. To ensure the possibility to access the deployed infrastructure in the future, the undertaking providing or authorised to provide public electronic communications networks performing the civil works should guarantee that it will deploy physical infrastructure with sufficient capacity, taking into account the guidance provided by the Commission. This is without prejudice to the rules and conditions attached to the assignment of public funds and the application of State aid rules.

(36) To ensure consistency of approaches, the Commission, in close cooperation with the Body of European Regulators (BEREC), could provide guidance on applying the provisions on civil work coordination, including but not only on apportioning of costs. The views of stakeholders and national dispute settlement bodies should be duly taken into account in the preparation of the guidance. 

(37) Effective coordination can help reduce costs and delays as well as deployment disruption, which can be caused by problems on site. One example where coordination of civil works can provide clear benefits are cross-sector projects to deploy 5G corridors along transport paths, such as road, rail and in-land waterways. These projects can often also require design coordination or co-design based on early cooperation between the project participants. As part of the co-design, the parties concerned may agree in advance on physical infrastructure deployment paths and the technology and equipment to be used, before the coordination of civil works. Therefore, the request for coordination of civil works should be filed as soon as possible.

(38) A number of different permits for deploying elements of electronic communications networks or associated facilities may be necessary in order to protect national and Union general interests. These can include digging, building, town planning, environmental and other permits as well as rights of way. The number of permits and rights of way required for deploying different types of electronic communications networks or associated facilities and the local character of the deployment could involve applying different procedures and conditions, which can cause difficulties in the network deployment. Therefore, to facilitate deployment, all rules on the conditions and procedures applicable to granting permits and rights of way should be streamlined and consistent at national level. While preserving the right of each competent authority to be involved and maintain its decision-making prerogatives in accordance with the subsidiarity principle, all information on the procedures and general conditions applicable to granting permits for civil works and rights of way should be available via single information points. This could reduce complexity and increase efficiency and transparency for all operators and particularly new entrants and smaller operators not active in that area. Moreover, operators should have the right to submit their requests for permits and rights of way in electronic format via a single information point. Those undertakings should also be able to retrieve information in electronic format about the status of their requests and whether they have been granted or refused.

(39) Permit-granting procedures should not be barriers to investment or harm the internal market. Member States should therefore ensure that a decision on whether or not to grant permits on the deployment of elements of very high capacity networks or associated facilities is made available within 4 months from the receipt of a complete permit request. This is without prejudice to other specific deadlines or obligations laid down for the proper conduct of the procedure, which are applicable to the permit-granting procedure in accordance with national or Union law. Competent authorities should not restrict, hinder or make the deployment of very high capacity networks or associated facilities economically less attractive. Specifically, they should not prevent procedures for granting permits and rights of way from proceeding in parallel, where possible, or require operators to obtain one type of authorisation before they can apply for other types of authorisations. Competent authorities should justify any refusal to grant permits or rights of way under their competence, based on objective, transparent, non-discriminatory and proportionate conditions.

(40) To avoid undue delays, competent authorities must determine the completeness of the permit request within 15 days from its receipt. The permit request should be deemed complete unless the competent authority invites the applicant to provide any missing information within that period. For reasons of equal treatment and transparency, the competent authorities should not consider permit requests for civil works to be admissible if the minimum information required under this Regulation has not been made available via a single information point within 3 months before the first permit request is submitted to the competent authorities. Where, in addition to permits, rights of way are required for deploying elements of very high capacity networks, competent authorities should, by way of derogation from Article 43 of Directive (EU) 2018/1972, grant such rights of way within 4 months from the receipt of the request. Other rights of way not needed in conjunction with permits for civil works should continue to be granted within 6 months in accordance with Article 43 of Directive (EU) 2018/1972. Operators that suffer damage due to the delay of a competent authority to grant permits or rights of way within the applicable deadlines should have the right to compensation.

(41) In order to ensure uniform conditions for the implementation of Article 7 of this Regulation, implementing powers should be conferred on the Commission. Those powers should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council 39 . The exemptions from the requirement for permits set out at Union level by way of an implementing act, could be applied to different categories of infrastructure (such as masts, antennae, poles and underground cables) under certain specified conditions, for which building permits, digging permits or other types of permits may be initially required. They could also be applied to technical upgrades of existing maintenance works or installations, small-scale civil works, such as trenching, and renewals of permits.

(42) In order to ensure that the procedures for granting such permits and rights of way are completed within reasonable deadlines, as appears from certain modernising and good administrative practices at national level, it is necessary to draw up principles for administrative simplification. This should include inter alia limiting the obligation of prior authorisation to cases in which it is essential and introducing tacit approval by the competent authorities after a certain period of time has elapsed. Moreover, the categories of deployments exempted from permits under Union law should no longer be subject to permits under national law.

(43) To facilitate the deployment of elements of very high capacity networks, any fee related to a permit, other than rights of way, should be limited to the administrative costs related to processing the permit request according to the principles established in Article 16 of Directive (EU) 2018/1972. In the case of rights of way, the provisions established in Articles 42 and 43 of Directive (EU) 2018/1972 apply.

(44) Achieving the targets set out in Decision (EU) 2022/2481 requires that, by 2030, all end users at fixed locations are covered by a gigabit network up to a network termination point and all populated areas are covered by next-generation wireless high-speed networks with at least 5G-equivalent performance, in accordance with the principle of technological neutrality. Providing gigabit networks up to the end user should be facilitated, in particular through fibre-ready in-building physical infrastructure. Providing for mini-ducts during the construction of a building has only a limited incremental cost, while equipping buildings with gigabit infrastructure may represent a significant part of the cost of deploying a gigabit network. Therefore, all new buildings or buildings subject to a major renovation should be equipped with physical infrastructure and in-building fibre wiring, enabling the connection of end users to gigabit speeds. New multi-dwelling buildings and multi-dwelling buildings subject to major renovation should also be equipped with an access point, accessible to one or more undertakings providing or authorised to provide public electronic communications networks. Moreover, building developers should provide for empty ducts from every dwelling to the access point, located in or outside the multi-dwelling building. Major renovations of existing buildings at the end user’s location to enhance energy performance (pursuant to Directive 2010/31/EU of the European Parliament and of the Council 40 ) provide an opportunity to also equip those buildings with fibre-ready in-building physical infrastructure, in-building fibre wiring and, for multi-dwelling buildings, an access point.

(45) The prospect of equipping a building with fibre-ready in-building physical infrastructure, an access point or in-building fibre wiring may be considered disproportionate in terms of costs, namely for new single dwellings or buildings undergoing major renovation works. This may be based on objective grounds, such as tailor-made cost estimates, economic reasons linked to the location, or urban heritage conservation or environmental reasons (for example, for specific categories of monuments).

(46) Prospective buyers and tenants should be able to identify buildings that are equipped with fibre-ready in-building physical infrastructure, an access point and in-building fibre wiring and that therefore have considerable cost-saving potential. The fibre readiness of buildings should also be promoted. Member States should therefore develop a compulsory ‘fibre-ready’ label for buildings equipped with such infrastructure, an access point and in-building fibre wiring in accordance with this Regulation.

(47) Undertakings providing or authorised to provide public electronic communications networks deploying gigabit networks in a specific area could achieve significant economies of scale if they could terminate their network to the building’s access point by using existing physical infrastructure and restoring the affected area. This should be possible irrespective of whether a subscriber has expressed explicit interest for the service at that moment in time and provided that the impact on private property is minimised, Once the network is terminated at the access point, the connection of an additional customer is possible at a significantly lower cost, in particular by means of access to a fibre-ready vertical segment inside the building, where it already exists. That objective is also fulfilled when the building itself is already equipped with a gigabit network to which access is provided to any public communications network provider, which has an active subscriber in the building, under transparent, proportionate and non-discriminatory terms and conditions. That could in particular be the case in Member States that have taken measures under Article 44 of Directive (EU) 2018/1972.

(48) In order to contribute to ensuring availability of gigabit networks to end users, new buildings and majorly renovated buildings should be equipped with fibre-ready in-building physical infrastructure, in-building fibre wiring and, in the case of multi-dwelling buildings, an access point. Member States should have a degree of flexibility to achieve this. This Regulation, therefore, does not seek to harmonise rules on related costs, including the recovery of costs of equipping buildings with fibre-ready in-building physical infrastructure, in-building fibre wiring and an access point.

(49) In line with the subsidiarity principle and to take national circumstances into account, Member States should adopt the standards or technical specifications necessary for the purpose of equipping newly constructed or majorly renovated buildings with fibre-ready in-building physical infrastructure and in-building fibre wiring; and new or majorly renovated multi-dwelling buildings with an access point. Those standards or technical specifications should set out at least: the building access point specifications; fibre interface specifications; cable specifications; socket specifications; specifications for pipes or micro-ducts; technical specifications needed to prevent interference with electrical cabling, and the minimum bend radius. Member States should make the issuance of building permits conditional on compliance of the relevant new building or major renovation works project requiring a building permit with the standards or technical specifications based on a certified test report. Member States should also set up certification schemes for the purpose of demonstrating compliance with the standards or technical specifications as well as for qualifying for the ‘fibre-ready’ label. Moreover, to avoid an increase in red tape related to the certification scheme set up under this Regulation, Member States should take into account the procedural requirements applied to certification schemes pursuant to Directive 2010/31/EU and also consider the possibility to enable the combined launch of both request procedures.

(50) In view of the social benefits stemming from digital inclusion and taking into account the economics of deploying very high capacity networks, where there is neither existing passive or active fibre-ready infrastructure serving end users’ premises nor alternatives to providing very high capacity networks to a subscriber, any public communications network provider should have the right to terminate its network to a private premise at its own cost, provided that the impact on private property is minimised, for example, if possible, by reusing the existing physical infrastructure available in the building or ensuring full restoration of the affected areas.

(51) Requests for access to the in-building physical infrastructure should fall under the scope of this Regulation, whereas a request for access to fibre wiring is to fall under the scope of Directive (EU) 2018/1972. Moreover, access to in-building physical infrastructure could be refused if access to in-building fibre wiring is made available under fair, reasonable and non-discriminatory terms and conditions, including price.

(52) To ensure consistency of approaches, the Commission, in close cooperation with BEREC, could provide guidance on the applications of provisions on access to in-building physical infrastructure, including but not only on the terms and conditions thereof. The views of stakeholders and national dispute settlement bodies should be duly taken into account in the preparation of the guidance.

(53) To foster the modernisation and agility of administrative procedures and reduce the cost of and time spent on the procedures for deploying very high capacity networks, the services of single information points should be performed fully online. To that end, single information points should provide easy access to the necessary digital tools, such as web portals, digital platforms, and digital applications. The tools should give access in an efficient manner to the minimum information on existing physical infrastructure and planned civil works and the possibility to request information. Such digital tools should also give access to the electronic administrative procedures for granting permits and rights of way and related information on the applicable conditions and procedures. Where more than one single information point is set up in a Member State, all single information points should be easily and seamlessly accessible, by electronic means, via a single national digital entry point. This entry point should have a common user interface ensuring access to the online single information points. The single national digital entry point should facilitate interaction between operators and competent authorities performing the functions of the single information points.

(54) Member States should be allowed to rely on, and where necessary improve, digital tools, such as web portals, digital platforms, and digital applications that might already be available at local, regional or national level to provide the functions of the single information point provided they comply with the obligations set out in this Regulation. This includes access through a single national digital entry point and the availability of all the functionalities set out in this Regulation. To comply with the ‘once-only’ data minimisation and accuracy principles, Member States should be allowed to integrate more digital platforms or applications supporting the single information points, as appropriate. For example, the digital platforms or applications supporting the single information points on existing physical infrastructure could be interconnected or fully or partially integrated with the ones for planned civil works and granting permits.

(55) To ensure the effectiveness of the single information points provided for under this Regulation, Member States should ensure adequate resources as well as readily available relevant information on a specific geographical area. The information should be presented with the right level of detail to maximise efficiency in view of the tasks assigned, including at the local cadastre. In that regard, Member States could consider the possible synergies and economies of scale with the points of single contact within the meaning of Article 6 of Directive 2006/123/EC of the European Parliament and of the Council 41 and other planned or existing e-government solutions with a view to building on existing structures and maximising the benefits for users. Similarly, the Single Digital Gateway provided for in Regulation (EU) 2018/1724 of the European Parliament and of the Council 42 should link to the single information points.

(56) The costs for setting-up the single national digital entry point, the single information points and the digital tools needed to comply with the provisions of this Regulation could be fully or partly eligible for financial support under Union funds, such as the European Regional Development Fund - specific objective: a more competitive and smarter Europe by promoting innovative and smart economic transformation and regional ICT 43 ; the Digital Europe Programme 44 - specific objective: deployment and best use of digital capacities and interoperability and the Recovery and Resilience Facility 45 - pillars on digital transformation and on smart, sustainable and inclusive growth, including economic cohesion, jobs, productivity, competitiveness, research, development and innovation, and a well-functioning internal market with strong SMEs, provided they comply with the objectives and eligibility criteria therein.

(57) In the event of a disagreement on technical and commercial terms and conditions during commercial negotiations on access to physical infrastructure or coordination of civil works, each party should be able to call on a national dispute settlement body to impose a solution on the parties to avoid unjustified refusals to meet the request or the imposition of unreasonable conditions. When determining prices for granting access to or cost-sharing for coordinated civil works, the dispute settlement body should ensure that the access provider and network operators planning civil works have a fair opportunity to recover their costs incurred in providing access to their physical infrastructure or coordinating their planned civil works. This should take into account the appropriate Commission guidance, any specific national conditions, any tariff structures put in place and any previous imposition of remedies by a national regulatory authority. The dispute settlement body should also take into account the impact of the requested access or coordination of planned civil works on the business plan of the access provider or network operators planning civil works, including their investments made or planned, in particular investments in the physical infrastructure to which the request refers.

(58) To avoid delays in network deployments, the national dispute settlement body should settle the dispute in a timely manner and, in any event, at the latest within 4 months from receipt of the request to settle the dispute in the case of disputes on access to existing physical infrastructure and 1 month when it concerns transparency on physical infrastructure, coordination of planned civil works and transparency on planned civil works. Exceptional circumstances justifying a delay in the settlement of a dispute could be beyond the control of the dispute settlement bodies, such as insufficient information or documentation that is necessary to take a decision, including the views of other competent authorities that need to be consulted or the high complexity of the file.

(59) Where disputes arise on access to the physical infrastructure, planned civil works or information thereof to deploy very high capacity networks, the dispute settlement body should have the power to resolve such disputes by means of a binding decision. In any case, decisions of such a body should be without prejudice to the possibility of any party to refer the case to a court or to conduct a prior or parallel conciliation mechanism to the formal dispute settlement, which could take the form of mediation or an additional round of exchanges.

(60) In accordance with the principle of subsidiarity, this Regulation should be without prejudice to the possibility of Member States to allocate regulatory tasks to the authorities best suited to fulfil them in accordance with the national constitutional system of attribution of competences and powers and the requirements set out in this Regulation. To reduce the administrative burden, Member States should be allowed to appoint an existing body or maintain the competent bodies already appointed pursuant to Directive (EU) 2014/61/EU. Information on the tasks allocated to the competent body or bodies should be published via a single information point and notified to the Commission, unless already done pursuant to Directive (EU) 2014/61/EU. The discretion that Member States retain to allocate the functions of the single information point to more than one competent body should not affect their ability to effectively fulfil those functions.

(61) The designated national dispute settlement body and the competent body performing the functions of the single information point should ensure impartiality, independence and structural separation towards the parties involved, exercise their powers impartially, transparently and in a timely manner; and have the appropriate competencies and resources.

(62) Member States should provide for appropriate, effective, proportionate and dissuasive penalties in the event of non-compliance with this Regulation or with a binding decision adopted by the competent bodies, including cases where a network operator or public sector body knowingly or grossly and negligently provides misleading, erroneous or incomplete information via a single information point. 

(63) Since the objectives of this Regulation aiming at facilitating the deployment of physical infrastructures suitable for very high capacity networks across the Union cannot be sufficiently achieved by the Member States because of persistent divergent approaches as well as the slow and ineffective transposition of Directive 2014/61/EU but can rather, by reason of the scale of the network deployments and investment required, be better achieved at Union level, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 TEU. In accordance with the principle of proportionality, as set out in that Article, this Regulation does not go beyond what is necessary in order to achieve those objectives.

(64) This Regulation respects fundamental rights and observes the principles recognised in the Charter of Fundamental Rights of the European Union, in particular this Regulation seeks to ensure full respect for the right to private life and the protection of business secrets, the freedom to conduct business, the right to property and the right to an effective remedy. This Regulation has to be applied in accordance with those rights and principles.

(65) This Regulation includes provisions covering all the substance areas covered by Directive 2014/61/EU, which should therefore be repealed.

(66) A period of six months between the entry into force and the application aims to give sufficient time to Member States to ensure their national legislation does not contain any obstacles to the uniform and effective application of this Regulation. The period of 6 months is without prejudice to the specific rules in this Regulation on the delayed application of specific provisions as specified therein. Member States are to withdraw national provisions overlapping with this Regulation or contradicting it by the time it starts to apply. As regards adopting new legislation during this period, it follows from Article 4(3) TEU that Member States have a duty of sincere cooperation not to take action that would conflict with prospective Union legal rules.