Annexes to COM(2010)271 - Market reviews under the EU Regulatory Framework (3rd Report) - Further steps towards the consolidation of the internal market for electronic communications - Main contents
Please note
This page contains a limited version of this dossier in the EU Monitor.
dossier | COM(2010)271 - Market reviews under the EU Regulatory Framework (3rd Report) - Further steps towards the consolidation of the internal ... |
---|---|
document | COM(2010)271 |
date | June 1, 2010 |
[5] In nearly 3 % of the cases the Commission opened an additional assessment period (Phase II).
[6] An overview of the Article 7 procedure can be found in Annex I.
[7] Commission Recommendation 2003/311/EC, OJ L 114, 8.5.2003.
[8] LT/2009/0990, SI/2009/1010, SE/2009/1018, DK/2009/1023.
[9] Local loop unbundling.
[10] UK/2007/0733, PT/2008/0851, ES/2008/0805, FI/2009/0900.
[11] UK, SE, SL, IT, PL, PT.
[12] Commission Recommendation 2008/850/EC, OJ L 301, 12.11.2008.
[13] Namely, decisions (i) to de-regulate markets no longer listed in Recommendation 2003/311/EC; (ii) not to regulate markets included in the Recommendation but which remain effectively competitive; (iii) amendments to technical details of a previously imposed remedy; and (iv) the extension of existing measures to another market player in a similar situation.
[14] e.g. ES/2008/0817, PL/2008/0831, CZ/2008/0840, NL/2008/0849, CZ/2008/0857, CZ/2009/0872, SI/2009/0893, SK/2009/0954, SE/2009/0968, PL/2009/0971, FI/2009/0985, IT/2009/0998, IT/2009/0999, SK//2009/1008, DK/2009/1024.
[15] IT/2009/0999.
[16] e.g. IT/2008/0842, BE/2009/0882, UK/2009/0901, IE/2009/0928, PT/2009/0956, RO/2009/1003, PT/2009/1011, PT/2009/1012, FR/2009/1028.
[17] BG/2009/866 and MTR Benchmark Snapshot, ERG (09) 23_final_090604.
[18] Commission Recommendation 2009/396/EC, OJ L 124.
[19] AT, BG, FR, IT, NL, UK.
[20] IT/2009/0890, DE/2009/0897, BG/2009/0911, SE/2009/0965, RO/2009/1001.
[21] DK/2005/0141, NL/2008/0822.
[22] CZ/2006/0356, EE/2007/0637-638, DE/2006/0402, SK/2007/0676, SK/2007/0696 and AT/2007/0579-580, NL/2008/0821, BG/2009/0911, LV/2009/0960, MT/2009/0979, LV/2009/0994.
[23] e.g. DK, EE, DE, HU, LV, SK, AT, CZ.
[24] EE/2007/0637-638, HU/2007/0662-663, SK/2007/0740, LV/2009/0960, LV/2009/0994, RO/2009/1001-1002, DE/2009/1006.
[25] e.g. ES/2008/0815, LU/2006/0526-527, BE/2007/0640, DE/2006/0402, IE/2007/0632, AT/2006/0543, CZ/2006/0351, SK/2007/0740, UK/2009/0898,DE/2009/1006.
[26] EE/2007/0637-638, SK/2007/0696. .
[27] ES/2008/0815, CZ/2008/0755.
[28] LV/2007/0565-566, GI/2007/0710-711, EE/2007/0637-638, IE/2007/0632, PL/2006/0380, GI/2007/0716, LV/2009/0994.
[29] ES/2008/0815.
[30] DE/2006/0402, LV/2007/0565-566, SK/2007/0696, LV/2009/0994.
[31] IT/2009/0890.
[32] ES/2007/0706, DE/2008/0813, DK/2009/1014.
[33] FR/2007/0669, FI/2008/0778, IT/2008/0779, PL/2008/0794, DK/2009/1014, GI/2009/0976-0977.
[34] ES/2007/0598, PT/2007/0707, DK/2008/0785, GI/2009/0976, PL/2009/0996.
[35] Long run incremental cost.
[36] BG/2009/0866, DK/2009/0914, CZ/2009/0959, SE/2009/1018.
[37] IE/2008/0746, CZ/2009/0959.
[38] DE/2008/0813.
[39] UK/2006/0498, EL/2008/0786, IT/2008/0802, PL/2009/0991.
[40] EL/2008/0786, IT/2008/0802, SE/2009/0941, DK/2009/1014.
[41] FR/2008/812, IT/2008/0802 (hereafter regulator committed to adopt a cost model in line with the Recommendation by 2010), BG/2009/0865, BG/2009/0866, RO/2009/0878, AT/2009/0910.
[42] On 19 May 2010, under the umbrella of the Europe 2020 strategy ( COM (2010) 2020) , the Commission adopted a Digital Agenda for Europe.
[43] Fibre to the Node/Cabinet.
[44] Fibre to the Home/Building.
[45] E.g. EE/2009/0942, FI/2008/0839, FR/2008/0780, IE/2009/0875, NL/2008/827, PT/20080850 (LLU market); BE/2007/0736 and BE/2009/0950, EE/2009/0943, FI/2009/0900, FR/2008/0781, NL/2008/0827, PT/2008/0851 (WBA market). .
[46] E.g. CY/2009/0869, CZ/2009/0933 withdrawn by NRA, DK/2008/0860, EL/2009/0934, SK/2009/0929 withdrawn by NRA (LLU market); CY/2009/0870, CZ/2008/0797, EL/2009/0935 (WBA market).
[47] e.g. AT/2009/0970, CY/2009/0870, CZ/2008/0797, EL/2009/0935.
[48] MT/2008/0803.
[49] More details can be found in Chapter 5.1 of Annex III in the SWD.
[50] e.g . UK/2007/0733, DK/2008/0862.
[51] AT/2009/0970.
[52] MT/2008/0803.
[53] e.g.DE/2007/0646, BE/2008/0801, SI/2009/0957.
[54] NL/2008/0826, SI/2009/0957.
[55] NL/2009/0868, SI/2009/0957.
[56] ES/2008/0820, FR/2009/993.
[57] e.g.FR/2008/0780, EE/2009/0942, ES/2008/0804, PT/2008/0851, IT/2009/0891.
[58] e.g. FR, ES, EL.
[59] e.g. BE, ES, NL, DK, EE.
[60] e.g. FI/2008/0839, IT/2009/0988.
[61] e.g.NL/2008/0827.
[62] LT/2006/0430, EL/2006/0422, UK/2008/0747, UK/2008/0787, NL/2008/0823, AT/2008/0836.
[63] UK/2008/0787, AT/2008/0836.
[64] IT/2009/1000.
[65] e.g. EE/2007/0643, DE/2007/0677.
[66] One NRA found no SMP on a more narrowly defined market for very high capacity terminating segments of leased lines, i.e. UK/2008/0787. Another NRA found SMP only on the low capacity leased lines market, i.e. LT/2006/0430.
[67] NL/2008/0823-0825.
[68] UK/2008/0859.
[69] EE/2007/0643.
[70] IT/2009/0999-1000.